The Balgreen contract involved a full system drain down, stripping out the existing one pipe system and existing cast iron radiators. We then installed a new 2 pipe system with the mains in the corridors, valved branches to feed each classroom and new Stelrad radiators throughout the school. The job was carried out over the school summer holiday period.